Keren Water Supply Project
CLIENT |
Natural Resources Consulting Engineers, Inc. |
LOCATION |
Keren, Eritrea |
Geological and Geotechnical Investigations
Geotechnical engineers with Michael W. West & Associates, Inc. completed preliminary and final geological and geotechnical investigations for the Keren Water Supply Project in Eritrea, Africa.
BACKGROUND
The water supply project included a 49-foot-high (15 meter) concrete diversion dam, a 2.5-mile-long (4.1 kilometer) supply canal/pipeline extending from the diversion dam to the water storage reservoir, a 170-foot-high (52 meter) Main Dam to be constructed of earth-rock materials, a 1.9-mile-long (3.1 kilometer) raw water pipeline, a water treatment plant, and a 16.2 mile-long (26 kilometer) treated water pipeline.
SOLUTION
Investigation work completed for each project element included geologic mapping, drilling and test pit exploration programs, geophysical investigations and laboratory testing. Geotechnical design issues associated with the Main Dam included deep, variable weathering of bedrock in the foundation and potential borrow areas; foundation preparation requirements; borrow area characterization; and identification and characterization of core material for an earth-rock dam.
RELATED INFORMATION
-
Our geotechnical and geological engineers have over three decades of experience providing a... MORE >Services | Geotechnical and Geological
-
WJE offers geotechnical and geological engineering services for new and existing water dams and... MORE >Services | Water Resource Dams and Canals
-
Our materials scientists provide comprehensive consulting services for the evaluation and... MORE >Services | Materials Evaluation and Testing