Hill Auditorium

 
CLIENT
University of Michigan
LOCATION
Ann Arbor, MI

Assessment and Repair of Terra Cotta Cornice Distress

In a proactive, restorative manner to help maintain the durability and integrity of the historic venue, The client engaged WJE to perform an assessment of the uppermost projected terra cotta cornice around the perimeter of Hill Auditorium. The purpose of the assessment was to review the condition of the terra cotta units, determine the type and extent of distress, develop technical repair documents for restoration, and provide quality assurance/quality control (QA/QC) during the restoration contractor’s execution of the repairs.


BACKGROUND

First opening its doors in 1913 and originally designed by Albert Kahn, Hill Auditorium is rectangular in plan with approximate overall measurements of 143 feet in the east-west direction by 119 feet in the north-south direction. The 17-inch thick exterior walls primarily consist of multi-wythe clay brick masonry with various accent features of limestone and terra cotta. One predominant feature located approximately 165 feet above grade is the ornate, multi-coursed, cantilevered, terra cotta cornice assembly.

SOLUTION

WJE performed an up-close visual survey of the terra cotta cornice and associated roof drainage elements above the main entrance of the building from grade, roof level, and from aerial lift. Based on our assessment, it was determined that the terra cotta units were in serviceable condition; however, accelerated deterioration had occurred from years of in-service exposure and water infiltration through the roofing system atop the cornice.

Working with University staff, WJE evaluated various options of repair treatment and work scope, including budgeting and schedule evaluation. Upon selection of an appropriate, historically-sensitive approach, WJE provided subsequent design services consisting of developing technical repair documents, providing bidding assistance, and performing QA/QC construction period services during implementation of the multi-year repair effort.