Experience
Douglas Smith evaluates, investigates, and designs repairs for pavement systems, civil infrastructure, parking garages, building facades, and a wide variety of materials used in construction. He has particular expertise in solving materials problems related to performance, durability, and compatibility with other materials or systems. Mr. Smith works frequently with WJE’s laboratories and has developed a number of test programs to assess construction materials. He is also the manager of WJE’s Dallas operations.
Prior to joining WJE, Mr. Smith served as a vice president with 3D/International (3D/I), a program and construction management firm. He was also a materials engineer with Law Engineering and Environmental Services, Inc., and worked at Southwestern Laboratories, Inc., a geotechnical and construction materials testing firm. At his prior firms, Mr. Smith managed large construction programs, conducted many investigations on building structures, systems, and components, and developed considerable laboratory experience.
REPRESENTATIVE PROJECTS
Construction Materials
- Riverfront Thirteen-Foot “Horseshoe” Concrete Tunnel - Dallas, TX: Assessment of the condition of 1,400-foot, thirteen-foot diameter, 1930s concrete tunnel for use in a redevelopment program
- Alvarado Junior High School - Alvarado, TX: Investigation of cracked cement-based and epoxy-based terrazzo floor systems
- Rowlett Sanitary Sewer Main - Rowlett, TX: Investigation of hydrogen sulfide corrosion of ductile iron pipe forced main and gravity system
- Vernon Newsom Stadium - Mansfield, TX: Investigation of gypsum-based handrail anchorage system
- Eagle 35 Warehouse - Fort Worth, TX: Investigation of slab hygroscopic salt accumulation resulting in slab moisture recurrence
- Alta Left Bank - Fort Worth, TX: Investigation of exterior cladding fiber cement panel cracking
- River Bend Villas - Fort Worth, TX: Investigation of premature deterioration of clay brick masonry screen walls and building cladding
Masonry
- Jones AT&T Stadium, Texas Tech University - Lubbock: Investigation of cast stone exterior cladding
- Laredo Federal Courthouse - Laredo, TX: Investigation of limestone cladding distress
- Apartment Complex - Grapevine, TX: Investigation of adhered manufactured stone veneer system, including in situ shear bond testing
- Cleburne High School - Cleburne, TX: Investigation of and repair design for the failed CMU veneer anchorage system
- First Baptist Church - Stephenville, TX: Investigation of 1920s cast stone distress
Pavement Investigation
- Cottonwood Valley - Irving, TX: Investigation of concrete pavement distress, design of repairs, and replacement for three-hundred-acre residential development
- Ford Motor Company Arizona Proving Ground - Yucca, AZ: Investigation of distress of asphalt pavement at twenty-six-acre vehicle dynamic testing area
- Tampa Harbour Yacht Club - Tampa, FL: Investigation of distressed concrete launch slab pavement at the high-load, multilevel dry storage boat barn
- Burns Motors - McAllen, TX: Investigation of rehabilitated asphalt pavement
- West Fourth Street - Taylor, TX: Litigation support regarding asphalt municipal pavement
Repair and Rehabilitation
- Old Dallas High School - Dallas, TX: Investigation of historic concrete, reinforcing steel, cast iron, and wood and repair design support for the adaptive reuse of the early 1900s school
- The Montane - Dallas, TX: Investigation and design of repairs to below-grade parking garage walls
- Exall Dam Pedestrian Bridge - Highland Park, TX: Repair design of a 1940s steel bridge supported on top of concrete dam
- Hackberry Creek - Irving, TX: Repair design of privately maintained residential concrete pavement network
Professional Affiliations
American Society of Civil Engineering, Dallas Branch - past president
International Concrete Repair Institute, North Texas Chapter - past president
Registrations
Professional Engineer in TX
Education
Texas A&M University
Bachelor of Science, Civil Engineering, 1983
Master of Science, Civil Engineering, 1985
RELATED INFORMATION
-
Bridge Condition Assessment and Repair Design MORE >Projects | Exall Dam Pedestrian Bridge
-
Pavement Evaluation, Maintenance, and Replacement MORE >Projects | Cottonwood Valley Subdivision
-
Investigation and Repair of Stone Cladding Failure MORE >Projects | Jones AT&T Stadium
-
Our professionals deliver practical repair and rehabilitation services that maximize the... MORE >Services | Repair and Rehabilitation
-
We apply the lessons learned from more than 175,000 projects to provide clients with a full... MORE >Services | Condition Evaluation
-
When the integrity or condition of a structure is in question, clients rely on us for answers MORE >Services | Structural Engineering
-
Clients rely on our experience and laboratory capabilities to develop innovative solutions to... MORE >Services | Materials Engineering
-
Learn about our Dallas office MORE >Offices | Dallas