Experience
Sayed Hakimi joined WJE in August 2022 with a background in construction field management and CAD drafting and design.
He supports project managers through nondestructive evaluation (NDE) and materials sampling for field investigations and construction, as well as developing construction documents.
Prior to joining WJE, Mr. Hakimi participated in numerous projects in Afghanistan, where his work included CAD and construction design. He served as the site resident engineer for the AIRD Training Center Building and as the senior project scheduler for the reconstruction of Darulaman Palace, which occurred over several years prior to the 100th anniversary of its construction. In the U.S., Mr. Hakimi transitioned to fire and life safety design with Smith Fire System.
REPRESENTATIVE PROJECTS
Concrete Structures
- Sound Transit E130 Track - Seattle, WA: NDE and coring of concrete for light-rail extension project connecting downtown Seattle to Bellevue, WA
- Distribution Center - Sumner, WA: Core extraction for assessment of distressed slab on ground
- Sunrise of Issaquah - Issaquah, WA: Sampling of concrete at failed guardrail connection to retaining wall
Repair and Rehabilitation
- Business Park - Kent, WA: Emergency shoring drawings for partial roof collapse
- Glacier West Self Storage - Belfair, WA: Construction documents for permitting and construction to repair fire damage
- Gerber Auto Body - Salem, OR: Construction documents to address fire damage to wood framing and concrete masonry unit structure
- Greenbrier Gunderson - Portland, OR: Repair drawings for restoration of collapsed roof at industrial manufacturing facility
- Private Aquarium - OR: Detailing for repair of private shark aquarium on elevated slab
Design
- Lincoln Square North - Bellevue, WA: Drawing design for mechanical equipment screens on existing high-rise roof
- Various Construction Projects - Kabul, Afghanistan: Design and drafting for the Consultant Bureau for Reconstruction and for the U.S. Army Corps of Engineers *
- AIRD Training Center Building - Kabul, Afghanistan: Review of contractor design and drawing submittals *
Construction Management
- Darulaman Palace - Kabul, Afghanistan: Cost-loaded and detailed schedules and weekly and monthly progress reports; training and supporting of field personnel in scheduling procedures *
- AIRD Training Center Building - Kabul, Afghanistan: Management of schedules, construction materials, and test processes; review of daily progress work and reports *
Fire Protection System Design
- Residential and Commercial Structures - Various Locations, WA: Design and drafting of sprinkler fire systems, as-built drawings and directing of installation, and coordination with Authorities Having Jurisdiction *
Historic Preservation
- Queen Anne Gymnasium - Seattle, WA: Site visit assessment and development of repair drawings for roof replacement
- Coquille River Lighthouse - Bandon, OR: Development of repair details for historic masonry, concrete, and iron elements, as well as rehabilitation details for accessibility ramps
- Emergency Maintenance Building - Tacoma, WA: Development of repair details for historic building envelope
- Darulaman Palace - Kabul, Afghanistan: Historic drawings and specifications for reconstruction *
* Indicates with previous firm
Education
Kabul Polytechnic University
Bachelor of Science, Civil and Industrial Construction, 2008
Highline College
Associate of Applied Science, Draft and Design Technology, 2021
RELATED INFORMATION
-
Our professionals deliver practical repair and rehabilitation services that maximize the... MORE >Services | Repair and Rehabilitation
-
We apply the lessons learned from more than 175,000 projects to provide clients with a full... MORE >Services | Condition Evaluation
-
Our professionals balance the need to provide practical, long-term solutions with the ability to... MORE >Services | Historic Preservation
-
Our independent design review secures a superior level of quality control as well as the... MORE >Services | Design Review